Horsepower:
          145HP
Dimensions:
          20’L x 9’ W x 11' H
Control system:
          Murphy eics

KEY HIGHLIGHTS:

  • Optimized cylinder selection maximizes operational flexibility and utilization of engine power
  • Pre-engineered design for expedited delivery and accelerated time-to-market
  • Factory load tested equipment and minimal assembly helps bring your operation online quickly

PACKAGE FEATURES:


  • Scrubbers ASME coded with 1/16" corrosion allowance
  • Piping adheres to ASME B31.3
  • API 5th Edition DA2 pulsation and vibration analysis performed for smooth operation
  • Murphy Centurion Panel
  • Rugged four-runner I-beam skid with environmental containment designed to be set on a prepared earth pad
  • Coalescing type fuel gas filter installed for maximum engine protection
  • Intel spool piece with basket strainer
  • Suction-based speed control
  • Automatic cooler Louvers
  • Heat tracing
  • Insulated scrubbers
  • Automatic makeup/recycle valve

PACKAGE OPTIONS:


  • 0.5G NOx emissions setting

  • Mounted oil day-tank
cta_image

THE WOLF - PERMIAN BASIN CASE STUDY

High-Pressure Gas Lift (HPGL) delivers strong artificial lift performance without the need for well intervention. But is it really as effective as ESP gas lift configurations? We partnered with 111-year-old operating company SM Energy to find out.

Engine: CATERPILLAR 3306BNA


  • Dependable industry standard G3300 platforms backed by Caterpillar's global dealer network
  • Engine Integrated Control System (EICS®)
  • 145 BHP @ 1800 RPM
  • 1.0 NOx, 2.0g CO standard emissions setting
  • Onboard alternator for reliable  24V power
  • Electric starter (24V) for reliable starting independent of gas supply
  • Operator interface included for setup and service without a laptop
  • Pressure-based automatic speed control

Compressor: Ariel JGQ/2


  • World Standard Compressor backed by Ariel service and support network
  • Available 72-month warranty
  • VVCPs included on 1st and 2nd stages for maximum operational flexibility
Cylinder Size Pressure
1st Stage Cylinder 7.125" JG 600 psig
2nd Stage Cylinder 4.75" P10-HE 1200 psig
3rd Stage Cylinder 3" P11-HE 1800 psig

COOLER: INDUCED DRAFT, VERTICAL DISCHARGE


  • Combined engine, compressor and gas cooling improves service access.
  • 15°F approach to ambient on aftercooler
  • Vertical section design simplifies cooler maintenance 
  • Vertical air discharge minimizes noise and hot air recirculation

hpgl vs esp
Year one cost evaluation

Is HPGL right for your operation? Walk through the Estis HPGL Evaluator, and explore the economic analysis of ESPs and High-Pressure Gas Lift.

 

[ get evaluation ]

Contact Request